This concrete footing calculator works out the cubic yards, the number of bags, the soil to dig, the rebar and the cost for a strip, pad or round pier footing. Choose the footing type, enter its size and depth, and it draws your footing in plan and in section, and checks it against the International Residential Code minimums. Tap the i button beside any field for an explanation.

Quick answer: concrete = length × width × thickness in feet ÷ 27, plus 10 to 15% extra. A 60 foot strip footing, 16 inches wide and 8 inches thick, takes about 2.17 cubic yards with 10% extra, or 98 bags of 80 pounds.

Concrete footing calculator: yards, bags, rebar and cost

Example values are loaded so you can see a result straight away. Change any field and the numbers, the drawings and the charts update.

1. Units and currency

i
US uses feet, inches, pounds and cubic yards. Metric uses meters, centimeters, kilonewtons and cubic meters. Switching resets the fields to example values in that system.
i
Only the symbol changes. Prices are not converted, so type your own prices in your own currency.

2. Footing type and size

i
Strip is a continuous band under a wall. Pad is a rectangular block under a post or column. Round pier is a cylinder poured into a tube or a drilled hole.
i
Use total length if you know the footing run. Use building rectangle to have the calculator add up the perimeter for you.
i
The total run of footing, measured along the center of the footing. Measuring along the outside of the wall gives a slightly longer run.
i
The length of the building, measured along the center of the footing. The calculator takes the footing run as 2 × (length + width).
i
The width of the building, measured along the center of the footing.
i
Extra footing under interior bearing walls, added to the perimeter. Leave at 0 if there is none.
i
The width of the footing across the trench. The code table for continuous footings depends on stories and soil, and 12 inches is the smallest width in it. Your building department sets the figure for your job.
i
How thick the footing is. The International Residential Code sets a minimum of 6 inches for a continuous footing.
i
The thickness of the wall that sits on the footing. It is used to work out how far the footing projects on each side. The code asks for at least 2 inches of projection, and no more than the footing is thick.
i
How many identical footings you need. Run the calculator once for each size if yours differ.
i
The length of one pad.
i
The width of one pad.
i
How thick each pad is.
i
The width of the round pier, for example the inside diameter of the form tube.
i
The height of concrete in each pier, from the bottom up.
i
The depth from the finished ground down to the bottom of the footing. It sets the soil to dig and is checked against the frost depth. The code requires at least 12 inches below undisturbed ground.
i
How deep the ground freezes where you live, from your building department. Footings must reach this depth. Leave at 0 to apply only the 12 inch minimum.

3. Soil and load (optional check)

i
The load the soil can carry, in pounds per square foot. 1,500 psf is the value the code table assumes. A soils report or your building department gives the real figure. Weaker soil than 1,500 psf needs an engineer.
i
The load on each foot of footing run. Concrete Network says the code implies roughly 2,500 pounds per foot for a two-story wood-frame house. Enter 0 to skip the check.
i
The load that one footing carries, from your plans. Enter 0 to skip the check.

4. Concrete

i
The size of premixed bag you would use. Quikrete gives about 0.30, 0.375, 0.45 and 0.60 cubic feet for 40, 50, 60 and 80 pound bags. Choosing a size also fills in an example price.
i
Extra concrete for spillage, uneven trenches and forms that are not exactly to size, as a percentage. Inch Calculator suggests 10 to 15%.
i
Ready-mix is priced by the cubic yard. Bags are priced per bag. The cost estimate uses whichever you choose.
i
The price of ready-mix per unit of volume. This is an example, not a quote. Ready-mix suppliers often charge extra for small loads.
i
The price of one bag of the size you chose. This is an example, not a quote.
i
Anything else you want in the total, such as forms, delivery, digging or labor. Enter a lump sum. Leave at 0 for materials only.

5. Rebar (optional)

i
A footing does not always need steel. It depends on the seismic category, the wall, the backfill, your plans and local amendments. Turn this on if your plans call for it.
i
Bar sizes are in eighths of an inch. #3 is 3/8 inch, #4 is 1/2 inch and #5 is 5/8 inch. The weight uses 0.376, 0.668 and 1.043 pounds per foot.
i
How many bars run along the footing. Two continuous No. 4 bars are common in some places and on engineered plans, but your plans decide.
i
Extra bar length for overlaps at splices, as a percentage. The lap length comes from your plans. 10% is an assumption you can change.
i
The distance between bars in each direction of the pad grid. The cover is 3 inches at each edge.
i
How many vertical bars go in each pier, each running the depth of the pier less 3 inches of cover.
i
The price of one 20 foot (6.1 m) bar. This is an example, not a quote.
Concrete to order

Plan view of your footing

A schematic of the footing run or the footings you entered.

Cross-section with the frost line

Drawn from your size, depth and frost depth. Widths are widened a little if they would be too thin to read.

Checks against published guidance

    Estimated cost by item

    Bags needed by bag size

    Concrete needed by size

      Estimates for planning only. Footing size, depth and reinforcement depend on your plans, your soil, your climate and your local building code, so follow your plans and your building department, and ask an engineer when in doubt. Prices are examples you can edit, not quotes. See our Disclaimer.

      How this concrete footing calculator works

      A footing is the wide, flat base of concrete that spreads the weight of a wall, a post or a deck onto the soil. Ordering the concrete is a volume problem, but the job also involves steel, digging depth and whether the footing is big enough for the ground. This concrete footing calculator handles all of that from one set of measurements.

      Pick the footing type, enter its size and depth, and the calculator returns the cubic yards, the bags, the soil to dig, an optional rebar count and a cost. It draws a plan and a cross-section and runs checks against the International Residential Code. Tap the i button beside any field to see what it means and where the rule comes from.

      It works as a footing calculator for concrete in a continuous strip under a wall, in square pads under posts, and in round piers poured into a tube or a drilled hole. Footer is just another word for footing, so it is also a concrete footer calculator, and a concrete deck footing calculator, because a deck’s posts usually sit on pads or piers. If you only need a single fence or mailbox post, the post hole concrete calculator is a better fit. For a flat slab, use the concrete slab cost calculator.

      Strip, pad and pier footings

      The three footing types need different measurements, so the form changes when you pick one.

      • Strip footing. A continuous band of concrete under a foundation wall. You enter the total run, or the length and width of a rectangular building plus any interior footing, then the footing width and thickness. Inch Calculator describes the volume as the total linear footage multiplied by the width and the depth in feet, divided by 27.
      • Pad footing. A rectangular block under a post or column. You enter how many there are and the length, width and thickness of each. The volume is length times width times thickness, divided by 27 for cubic yards. If you think in square feet, the area times the thickness gives the same answer, like a concrete square foot calculator.
      • Round pier footing. A cylinder, usually poured into a form tube or a drilled hole. Inch Calculator gives the volume as π times the radius squared times the depth, with the radius in feet and the result divided by 27.

      For a monolithic footing and wall, Inch Calculator says to work out the footing and the wall separately and add the two volumes. Run the calculator once for each part.

      How to calculate concrete footings: measuring and formulas

      For a strip footing, measure the run along the center of the footing and not along the outside of the wall. The outside of the wall gives a slightly longer run than the footing itself. Use the rectangle option for a simple building: it takes the perimeter as two times the length plus the width, then adds any footing you need under an interior bearing wall. For an L-shaped or irregular building, add up the straight runs and use the total length option.

      For pads and piers, enter how many identical footings you have. If the sizes differ, run the calculator once for each size and add the results.

      Also enter the depth to the bottom of the footing below the finished ground. It does not change the concrete in a strip or a pad, but it sets the soil to dig out and feeds the depth check below.

      How wide and how thick should a footing be?

      There is no single answer, because the size depends on the load, the soil and your local code. A few published rules give a starting point. The International Residential Code sets a minimum footing thickness of 6 inches for a continuous footing, and it asks the footing to project at least 2 inches beyond each face of the foundation wall but no more than the footing is thick. The calculator checks both.

      For width, the prescriptive table in the code depends on the number of stories and the load-bearing value of the soil. The 2024 code lists minimum widths of 12, 15 and 23 inches for one, two and three stories on 1,500 psf soil, as summarized by Jaspector, while an older table reproduced by Concrete Network gives 16, 19 and 22 inches for wood-frame houses. Tables change between editions, so treat any figure on a website, including these, as an example and take the real one from your building department.

      The soil check in the calculator is simple physics rather than a table. It divides the load on the footing by the area of footing touching the ground. Concrete Network points out that a 12 inch wide footing gives 1 square foot of bearing area per linear foot, and that the code implies roughly 2,500 pounds per linear foot for a two-story wood-frame house, which it calls a little conservative but reasonable. That figure is the default load in the calculator, and you can replace it with your own. If the pressure comes out above the soil value you chose, the check turns red and tells you how wide the footing would need to be.

      The soil value for a real building comes from a soils report or your building department. If the ground is weaker than 1,500 pounds per square foot, Jaspector notes that the code table no longer applies and an engineer needs to design the footing.

      How deep to dig, and the frost line

      The code says footings must extend at least 12 inches below the undisturbed ground surface or to the local frost depth, whichever is deeper. In cold climates the frost depth is often the deeper of the two, and a footing above it can move as the soil freezes and thaws. The MyBuildingPermit checklist adds that footings must not bear on frozen soil.

      Enter your local frost depth in the form and the cross-section draws it as a dashed line, so you can see at a glance whether the bottom of the footing is below it. If you leave the frost depth at 0, the calculator only applies the 12 inch minimum.

      Bags or ready-mix?

      The number of bags depends on how much concrete each bag makes. The Quikrete data sheet gives about 0.30 cubic feet for a 40 pound bag, 0.375 for 50 pounds, 0.45 for 60 pounds and 0.60 for 80 pounds. To get the footing concrete quantity in bags, the calculator divides your volume, including the extra allowance, by the yield of the size you pick and rounds up. A chart shows the concrete quantity for the footing in all four bag sizes.

      Bags are practical for small jobs such as a few piers. For larger volumes, ask a ready-mix supplier for a quote, because mixing that many bags by hand is slow.

      Whichever you choose, order a little extra. Inch Calculator suggests 10 to 15% more material to cover spillage and forms that are not exactly to dimension, and notes that an excavation can have voids or vary in depth. The calculator starts at 10% and lets you change it.

      Rebar in footings

      A footing does not automatically need steel. According to Jaspector, whether reinforcement is required depends on the seismic design category, the wall type and height, unbalanced backfill, engineered plans and local amendments. Two continuous No. 4 bars are common in some places and on engineered plans, but that is not an automatic code requirement. If your plans call for rebar, the bar size, spacing, splices and cover come from the plans.

      Turn the rebar option on and the calculator estimates the length you need, in 20 foot bars:

      • Strip footing: the number of continuous bars times the run, plus your lap allowance for overlaps. The default allowance is 10%, which is an assumption you should replace with the lap length on your plans.
      • Pad footing: a grid of bars in both directions at the spacing you choose, with 3 inch cover at each edge.
      • Round pier: the number of vertical bars you enter, each running the depth of the pier less the cover at the bottom.

      The 3 inch cover is the figure ACI 318 gives for concrete cast against and permanently exposed to the ground, as listed in the MyBuildingPermit checklist. Treat the result as a purchasing estimate, not a reinforcement design.

      What does a concrete footing cost?

      The cost has three parts: the concrete, the steel and everything else. For the concrete, the calculator multiplies the ordered volume by your ready-mix price per cubic yard, or the number of bags by your price per bag. The steel is the number of bars times a price per 20 foot bar. A field for other costs lets you add forms, labor, delivery or a short-load fee.

      The prices in the form are examples and not quotes. Concrete prices change by region and by season, and a small ready-mix order can carry a minimum charge. Replace each price with a real quote from your supplier. Used as a concrete footing cost calculator, it gives a materials estimate, so the result will be lower than a contractor’s bid, which includes digging, forms, pouring and finishing. If you are comparing a footing against a slab, the concrete slab cost calculator works the same way.

      Worked example: a 60 foot strip footing

      Suppose you are pouring a strip footing 60 feet long, 16 inches wide and 8 inches thick, with 10% extra and a bottom depth of 36 inches.

      1. Convert the width and thickness to feet: 16 inches is 1.333 feet and 8 inches is 0.667 feet.
      2. Volume = 60 × 1.333 × 0.667 = 53.3 cubic feet, which is 1.98 cubic yards.
      3. Add 10%: 2.17 cubic yards to order.
      4. In 80 pound bags, at 0.60 cubic feet each, that is 58.7 ÷ 0.60 = 98 bags, rounded up.
      5. Soil to dig = 60 × 1.333 × 3 = 240 cubic feet, or 8.89 cubic yards.
      6. Soil pressure at the default 2,500 pound per foot load = 2,500 ÷ 1.333 = 1,875 pounds per square foot, which is under a 2,000 psf soil.

      Run the same footing at 12, 16, 20 and 24 inches wide and the concrete changes as the table shows.

      Footing width (8 in thick)Cubic yards for 50 ftCubic yards for 100 ft80 lb bags for 100 ft with 10% extra
      12 in1.232.47123
      16 in1.653.29163
      20 in2.064.12204
      24 in2.474.94245

      For comparison, a round pier is much smaller. The table gives the volume of a single pier by diameter and depth, and how many 80 pound bags it takes before any extra is added.

      Pier diameter24 in deep36 in deep48 in deep
      8 in0.70 cu ft, 2 bags1.05 cu ft, 2 bags1.40 cu ft, 3 bags
      10 in1.09 cu ft, 2 bags1.64 cu ft, 3 bags2.18 cu ft, 4 bags
      12 in1.57 cu ft, 3 bags2.36 cu ft, 4 bags3.14 cu ft, 6 bags
      16 in2.79 cu ft, 5 bags4.19 cu ft, 7 bags5.59 cu ft, 10 bags

      Footings for decks and posts

      Deck footings are usually pads or round piers, one under each post. The right size depends on the load that post carries, the soil and the frost depth, so there is no universal figure. Work from your deck plans or your building department. To use this page, choose pad or pier, enter how many footings you need, set the size and the depth, and enter the load on each one if you know it. For the rest of the deck, see the deck joist calculator and the deck stair calculator.

      Common mistakes

      • Stopping above the frost line. A footing that sits above the local frost depth can move as the ground freezes and thaws.
      • Skipping the soil. A footing that is wide enough on paper can still sink on weak or disturbed soil.

      Frequently asked questions

      How do you calculate concrete for footings?

      Multiply the length, width and thickness in feet to get cubic feet, then divide by 27 for cubic yards. For a strip footing, the length is the total run. For a round pier, use π times the radius squared times the depth. Add 10 to 15% extra and round up. The calculator does all of this and shows the bags too.

      How many bags of concrete do I need for a footing?

      Divide the volume, with extra, by the yield of your bag: about 0.30 cubic feet for 40 pounds, 0.375 for 50, 0.45 for 60 and 0.60 for 80 pounds, according to the Quikrete data sheet. One 12 inch round pier that is 36 inches deep needs about 5 bags of 80 pounds with 10% extra.

      How many yards of concrete per square foot?

      Multiply the thickness in inches by 0.00309 to get cubic yards per square foot. At 8 inches thick that is about 0.0247 cubic yards per square foot, so a pad of 100 square feet takes about 2.47 cubic yards before extra. The calculator finds this for you when you enter the pad size.

      What size should a concrete footing be?

      It depends on the load, the soil and your local code. For continuous footings the International Residential Code gives a minimum thickness of 6 inches and lists minimum widths by number of stories and soil value. Check the table your building department uses, because editions differ.

      How deep should a footing be?

      At least 12 inches below undisturbed ground and at least to the local frost depth, whichever is deeper, under the International Residential Code. Your building department sets the frost depth for your area.

      Do concrete footings need rebar?

      Not always. The plans decide. If yours call for rebar, turn the option on and the calculator counts the bars from the bar size, number and spacing you enter.

      Is a footer the same as a footing?

      Yes. Footer and footing are two names for the same base of concrete, and this calculator works as a footer calculator for concrete as well.

      Can I use this for deck footings?

      Yes. Choose pad or round pier and enter the number, size and load. The size itself should come from your deck plans or building department.

      How much does a concrete footing cost?

      Enter your ready-mix or bag price, your rebar price and any other costs, and the calculator adds them up. At its example prices a 60 foot strip footing 16 inches wide and 8 inches thick comes to about $326 for materials. Replace the examples with real quotes, and remember that digging, forms and labor come on top.

      Sources and further reading

      Codes and tables change between editions and locations. Always confirm footing size, depth and reinforcement with your building department or a licensed engineer before you pour.

      For the rest of a concrete project, the concrete bag calculator and the concrete yard calculator convert any volume into bags or yards, and the concrete block calculator counts the blocks that go on top. The fence calculator and the post hole concrete calculator cover posts, and the paver calculator and retaining wall calculator cover hardscape. Browse everything in the concrete calculators hub.

      About the author

      Shivam · Software engineer and founder of Calctoolz

      I build the calculators on Calctoolz. For each tool I read the original formula or published guidance, write the logic to match it, and check the results against hand calculations before publishing. I am not a structural engineer, a concrete contractor or a building inspector, so this page is for planning and ordering, and your plans, your soil report and your local building code come first. If you spot a number that looks wrong, please tell me.

      How this page was checked: the volume formulas follow Inch Calculator, the bag yields follow the Quikrete data sheet, and the thickness, projection, depth and cover checks follow the International Residential Code as summarized by Jaspector and the MyBuildingPermit footing checklist. The soil load figure follows Concrete Network. The maths was checked against hand calculations and an independent calculation. Prices, the lap allowance and the rebar weights are editable assumptions. Last reviewed November 16, 2026. This page is not engineering or construction advice.

      Rate this calculator